Three things change depending on where you live: who you notify, how much the panel actually makes, and who has to say yes first. Here are all three for Manchester.

Step one, and it is a legal requirement

In Manchester you notify Electricity North West

Electricity North West · North West licence area

Your network operator is fixed by your postcode. You cannot choose it and switching electricity supplier does not change it. Great Britain is divided into fourteen licence areas, and Manchester falls in the North West licence area.

Watch the boundary. Electricity North West covers Greater Manchester, but head towards Merseyside or Cheshire and you cross into SP Energy Networks territory.

G98 notification is not optional and it is not the same thing as telling your supplier. It is a short form, it is free, and the QR code on your kit links straight to the right one. Do it before you connect, not after.

Modelled output

What 800W realistically makes in North West England

These are irradiance model figures for 800W of panel, not measurements from a roof down the road. Treat them as a ceiling you will fall short of rather than a target.

OPTIMAL TILT

740 kWh

Per year, south facing, angled properly on a garden frame or flat roof with nothing shading it.

VERTICAL RAIL

460 kWh

Per year, mounted flat against a south-facing balcony railing. The convenience costs you output.

WHAT YOU KEEP

25–60%

The share you use as it is generated. The rest goes to the grid for nothing. Being home in the day is worth more than a bigger kit.

Manchester's reputation for rain overstates the problem. Panels generate on overcast days, just less. What actually costs you output here is shading from neighbouring towers in the city centre, which is worth ten minutes with a compass before you buy.

The one most people buy

Two panels on one 800VA inverter. The sweet spot for a typical home's background load, and the largest output the rules allow.

inc. VAT and delivery
Local reality

Housing stock in Manchester

Manchester and Salford have built more high-rise flats in the last fifteen years than anywhere in the UK outside London. That is a very large balcony market, and it is also where the cladding exclusion bites hardest.

This is the one city where we would ask you to check the building before anything else. The product specification rules out buildings with ACM, MCM, HPL or timber cladding, and anything currently under external wall fire remediation. Greater Manchester has a high concentration of affected blocks. Your building manager will know the status, and if remediation is live the answer is no for now.

Permission questions locally go to Manchester City Council, or Salford, Trafford and Stockport in the wider conurbation, though for a freestanding panel in a private rear garden you are usually dealing with a lease or a landlord rather than a planning officer.

The national rules apply here as everywhere

800VA cap, one device per household, certified complete kits only, no batteries. Full explainer →

Manchester questions

Straight answers

Which DNO do I notify in Manchester?

Electricity North West, in its North West licence area. G98 notification is mandatory before you connect a plug-in solar kit, and it goes to your network operator, not your electricity supplier.

How much electricity will a plug-in solar kit make in Manchester?

An 800W array in Manchester models at roughly 740 kWh a year at optimal tilt, or around 460 kWh flat against a vertical balcony rail. You only save money on the share you use as it is generated.

My block is being reclad. Can I still buy one?

No, not until the work finishes. Buildings under external wall fire remediation are excluded from the product specification outright, as are ACM, MCM, HPL and timber cladding. Greater Manchester has a lot of affected blocks. Ask your building manager for the current status.

Ready when you are

Kits that ship to Manchester

Every kit is certified as a complete product, ships free, and comes with the G98 notification link for Electricity North West. Use Electricity North West here and it fills in the local operator.

Kits available from 27 August 2026

That is the date SI 2026/848 comes into force and plug-in solar becomes legal to self-install in Great Britain. Certified kits are listed here as soon as they are available.

See all kits

Ships to England, Wales and Scotland. Northern Ireland sits outside SI 2026/848, so we cannot supply plug-in kits to NI addresses.